|
Project: Site Formation & Foundation Works
Proposed Residential Development at 9A-9H Seymour Road & 1-7 Ying Fai Terrace, Hong Kong
Scope: Temporary Platform, Driven Steel H-Piles over 27m of level difference, Sheet Piles, ELS & Pile Cap
|
|
Project: Site Formation & Foundation Works
Proposed Residential Development at 350 Tai Hang Road, Hong Kong
Scope: Pipe Piles, ELS, Retaining Wall & Raft Footing
|
|
Project: Site Formation & Foundation Works
1 High Street & 5 Hospital Road, Mid-Level, Hong Kong
Scope: Demolition of Existing Building, Soil Nails, Temporary Platforms (Contractor's T5 Endorsement), Bored Piles, Sheet Piles, ELS, Retaining Wall & Pile Cap
|
|
Project: Proposed Site Formation & Foundation Works
Tanner Hill Elderly Housing Development 2-4 Tanner Road, North Point
Scope: • Minipiles
• Large Diameter Bored Piles
• Pre-bored Socketted H-Piles
• Site Formation, ELS, Raft Footing and Pile Cap Alteration Works
|
|
Project: Design & Construction Contract
Site Formation & Foundation Works
Residential Building & Dual-way Vehicular Access Ramp
NKIL 4850, Tai Po Road, Shatin (ex-Carlton Hotel)
Scope: Temporary Working Platform, Soldier Pile Wall, Minipiles Wall, Bored Pile Foundation, Raft Footing Foundation, Socket H-Pile Foundation, Soil Nails, ELS Pile Cap, Retaining Wall & Superstructure
|